logo

THE PROJECT | THE IMPACT | THE LAND | THE ALTERNATIVES | THE PROGRESS | THE CAMPAIGN main
   
THE OPPOSITION MOVEMENT
 

AGENDA

The Campaign against the Quart Cinturó

The Campaign against the Quart Cinturó consists of more than 250 neighbourhood, cultural and ecologist groups from Vallès Occidental, Vallès Oriental, Baix Llobregat and Penedès, with the aim of working to stop the construction of this road.

19th May 1996

Demonstration Terrassa-Sabadell, 19th May 1996

What do we want

FROM THE MINISTERIO DE FOMENTO AND THE GOVERNMENT OF THE GENERALITAT OF CATALONIA:

  1. The complete withdraw of the Quart Cinturo project from the infrastructure directory Plan 1993-2007 and the Catalonia roads Plan.
  2. The carrying out of a thorough technical study of the possible environmentally sustainable alternatives.
  3. A substancial revision of the General Territorial Plan for Catalonia.

FROM LOCAL TOWN COUNCILS:

That they take up an official position favouring the withdrawl of the Quart Cinturó project and the carrying out of a thorough, technical study of the environmentally sustainable alternatives.

FROM YOU:

That you take up a stance against the irrationality of the present transport and land useage model and "get moving" against the Quart Cinturó and General Territorial Plan for Catalonia .

ADDRESS OF THE CAMPAIGN AGAINST THE QUART CINTURO

If you want to join us or require any information simply get in contact with us:

Campaign against the Quart Cinturó of Barcelona

Tel: 93 717 1887 Fax: 93 717 1963

Postal address: Apartat de correus núm 123

08202 Sabadell SPAIN

Current account number: 2013-0179-75-0200809929

serp

  main